How to install an installation with a sliding toilet with your own hands

The main recognition of the installation is the economical use of space, occupied by plumbing cabinets in the cistern of the building construction and engineering communications. In this case, all functional possessions are masked by a decorative false panel or by a rebar.

We see two types of installation, depending on the method of their installation.

  1. The frame structure has its own name, even if all the parts of the plumbing fittings are connected to purchase additional steel frames and studs. A toilet bowl from a cistern is attached to it, and the system is also evil. Space fixation of the whole possession is established at 4 points: at 2 - on the capital walls, and at 2 - on the slabs of pidlogs.
  2. Block construction, only walls are installed on the wall with a sufficient building that they carry. Such an installation for a toilet bowl can be chosen in advance of preparations and even more covered with a decorative partition. The reinforcement of such a virobu is only built on a metal basis.
The frame installation is fastened to the sub-log of that wall. The frame of the block installation is less fastened to the wall.

Dimensions of plumbing installations for bathrooms are not limited. Like in frame, so in block installations, the average width is 350 - 500 mm, height 1000 - 1400 mm, depth 120 - 310 mm, height of the hanging toilet bowl with hinges up to 430 mm.

Advantages and shortcomings of installed toilet bowls

On this day, few people have already appreciated the positive aspects of sanitary ware. You can see such advantages of such a possession:

  • compact rozmіr virobu zaoschadzhuє mіsce, visually expanding the space;
  • easy access to all the outer parts for cleanliness, so tidying up the bathroom will not take a lot of time and we will not become great difficulties;
  • noiseless zliv vodyaki іzolyatsії cistern with wall structures;
  • often vikoristovuvany rasdіlny zliv drive streams of raznoї force to secure and protect;
  • installation of a toilet bowl with installation and overhead and long-term construction, which shows the advancement of the exploitation;
  • sliding toilet bowls are not a cross-gorge of heating systems, as well as laying tiled flooring.
The operation of the installation takes only a few months.

From the lack of installed plumbing, you can see:

  • vіdsutnіst access to kommunіkatsiy, skіlki stench zakryvayutsya decorative wall;
  • regardless of those that the design is unbalanced and rarely get out of tune, to eliminate emergency situations connected with the tank, there will be a need for additional equipment for dismantling the decorative screen, as well as for the road components;
  • regardless of the economy of space in the chosen view, the suspended toilet bowl with installation, the expansion of the frame is somehow wider for the great sub-log plumbing, sometimes at the installation stage it will be required to expand the space for fixing the load-bearing frame;
  • installation of toilet bowls at the classical vikonannі does not affect the navkolishhnіh walls of special sparseness, and the axis of the block structure can be fastened only to the slab support.
The dismantling of the wall is necessary to be unhandy when repairing the toilet bowl with the installation.

Choice of the month and blackness of the installation stages

When choosing the best dressing of the toilet bowl, respect is given to a number of peculiarities of the place. First, with yogo geometrical parameters. Naturally, the installation of the next step is there, de plumbing fittings are less important. Good solutions are kutova іnstalyatsіya, scho allows you to economically vikoristovuvaty space, and also helps to implement non-standard design solutions.


For sale є kutovі іnstalyatsії, but in principle a larger frame installation can be installed in the kutovі іnstalyatsіy.

In another way, important is the proximity of the passage of communications, especially sewers. podovzhennya іnzhenernih tras vimagatim vidіlennya dodatkovogo mіstsya for them. In addition, it is possible to repair the installation of sewerage (1.5-3 cm per 1 m), which, at the same time, increases the height of the installation. At the center of the factor, there was a trace of respect, which would also make it easier for further operations to organize the point of anger and the need for water for the other possession of the sanitary unit.

Chergovist vykonannya robit zbirannya іnstalyatsії toilet bowl with their own hands
it is laid down in the dotrimani cover instructions, so that the following main stages are determined:

  • designation of a place for placing a sanitary ware with a frame or a block system;
  • installation and reinforcement of all structural elements;
  • supply and connection of communications;
  • re-verification of all systems.

Preparation before installation

Necessary tool

It starts with the supply of the necessary components, preparation of the working space and the tool. Perforator it is necessary for harvesting openings in concrete or concrete, and float rіven(Manual size 50-60 cm) to control the vertical and horizontal orientation of the room. You will need the following: a set of wrenches, a hammer, drill bits or drills with hard-alloy tips, possibly pliers, twists, bud lower. To accurately designate the place where the installation for the toilet bowl will be installed, more needed olive and roulette. The presence of everything necessary under the hand to speed up the process of choosing and save your nerves.

What do you need to bribe

At the stage of preparation, the following should be taken care of:

  • the accuracy of the layout of the niche and the applicability її for the installation of the model of possession, which is to be bought;
  • it is better to purchase a toilet bowl-installation as a whole set, in order to spare yourself the entrance to the selection, or to add the elements to the availability of their openings;
  • upon purchase, carefully check the completeness of parts (non-slip frames, spring keys, spring tank, presence of adapters, fixation elements);
  • choice of the method of fastening for a block or frame structure, in view of which the erection works should lie far away;
  • it is possible to choose a model with an electronic way of cutting and manually pressing buttons for zlivu. Podіbnі virobi provide special comfort for further exploitation.

Vikonannya vimir_v ta rozmіtki

The scheme of the stages of the layout for the installation of the toilet bowl is represented by the following parts:

  • an axis line is applied to the wall, which will pass through the center of the future installation;
  • the clearance between the wall and the structure is frozen (the fault is to become no less than 15 mm, more is allowed);
  • signs are painted on the wall, where you know there is a tank for pouring water;
  • badges are left on the underside, as well as on the wall, deconstruction of the reinforcement of the structure.

Accuracy and respect for the preparation at the preparatory stage, it is easier to ease the advance of the upcoming warehouse entries.

Construction installation

To install the vbudovanoy design of the toilet bowl with their own hands, the fixing elements are used to enter the set of the slab, so it’s okay (for example, the studs for mounting the toilet bowl). The stench is guilty of being brothers from the reserve of minerality, the shards will be the most significant mechanical advances.

  1. On the back of the holes applied by the perforator, openings are prepared for the installation of rose dowels. Be it a model of installation, it can be fixed at the vertical and horizontal planes.
  2. For additional bolts and adjusting nuts, which are included in the kit, the body of the installation is fixed.

You should also set the correct space for the position of the fastenings, which should be placed for horizontal or vertical orientation. Exposing the body of the sanitary ware, they are peeled by the bud_velny equal.

The adjustment of the horizontal parts of the installation for the toilet bowl is carried out by lower bearing frames, which are fixed at the right position at the required height.

Vertical adjustment of the hull is made by adjusting the anchor, which is a trace of perfect locking.

Mounting the frame of possession, it is necessary to achieve special accuracy, and also to ensure that it is fixed. In addition, there will be a lot of pressure, there is plenty of room for a normal plumbing work without rotting under pressure, as a result of which it can be damaged like ceramics itself, so the panel, which closes the installation.

Connecting plumbing fixtures

At the final stage of the installation of the toilet bowl with the installation of the most important operations, there is an additional connection to the water supply and sewer line.

The watering of the tank is on the side or the beast, however, in case of any kind of rotting, it is not recommended to put the hoses to connect the tank with the water supply through their short term of service. Tim more, so at the time of the exit їх out of harmony, the replacement of the water supply and the dismantling of the false wall (for example, not transferring the hatch for access to the utilities). For these reasons, it is necessary to use pipes made of polymeric materials or stainless steel bellows.

To connect the cistern to the water supply, it is necessary to pipe the pipes from polymeric materials. 1. Inlet for connection to the outlet of the toilet bowl is inserted into the sewer.
2. Dali vіdvіd to fasten to the frame of the installation for the help of a plastic clamp with a clasp.

At the frame, the studs are screwed in and locked to attach the bowl of the hanging toilet bowl. In some models, the fastening of the studs was added to the frame installation and additionally to the capital wall.


Intermediate control is victorious. The internal structure is closed with a false panel. Panels are often made from gypsum board sheets, then decorated with tiles or plaster.


Gibsokarton - the most suitable material for the installation of false walls.

Plasterboard is a handy one, which can be easily opened in a new place for installation with a toilet bowl, as well as with a zmiva button.

Important! If you have completed the false wall with tiles, then you can hang the bowl of the hanging toilet bowl only after the tile adhesive has fully hardened (7 days).


To connect the toilet to communication, the pipes are shortened to the required size.

To connect the toilet bowl with communication systems (up to the sewage tank) special pipes are installed. Dovzhina stub pipes in ide іz stock. Nadal pipes are shortened to the required size with the improvement of the comrades of the decorative panel.


To protect the walls and the toilet between them, a shock-absorbing pad is installed between them. And on the studs, PVC pipes are fastened.

The toilet is strongly attracted to the load-bearing structure. To prevent damage to the surface of the toilet bowl when tightening the nuts, the set has washers made of metal plastic.

You can learn about the principle of the operation of the button of the pouring tank by marveling at the video:

After closing the toilet bowl with a cistern and sewerage, the entire structure must be re-checked for material, properly folded around the okremih elements, reinforced and sealed.

Final stage

After the completion of the work, the entire structure is re-checked for tightness. For this, simply draw water into the tank until it is full. Let's pour water into the toilet bowl, watch out for no leaks, such an onslaught.

The most common possible problems and ways to fix them.

  1. As a result, there were signs on the toilet bowl, which may be caused by incorrectly laying the sealing sealing gaskets. The stench is easily regulated and changed. Turn on the water, twist the fixing of the toilet bowl to the load-bearing structure, turn over the gaskets.
  2. Like the toilet is weakly fastened, bolts are pulled up to fasten it to installation. It is necessary to take care not to harm the cutting and not to crush the ceramics.
  3. As if weakly throwing off the water into the sewerage, next to change at the sufficiency of the pipes, the social and smoothness of their turns.

What else is important to know?

  1. There are two ways to strengthen the budding possession:
    • the frame is fixed, followed by an angry tank and pipes;
    • Okremo zdіysnyuyut installation of the system's system, with an offensive installation on the spot.
  2. What is independent of the chosen option is necessary to know:
    • the piping of pipes to the toilet bowl is carried out after the installation of installation and false panels with openings for pipes and reinforcement;
    • to protect the sound of the carcass when installing and connecting the toilet bowl, the obov'yazkovo is checked with a straight line.
  3. What are the points of view of the transparency of koristuvannya: